Okuma’s DS1 – Factory of the Future

Okuma Corporation’s new DS1 (Dream Site 1) manufacturing facility in Oguchi, Japan began operation at the World Headquarters Plant in 2013, producing multitasking machines, medium-sized and large CNC lathes--both horizontal and vertical. The new facility transforms operations into a “Smart Factory” manufacturing environment, where an increased range of Okuma’s CNC machine products are produced efficiently and in short run production. This enables shorter delivery times, reduced costs, and enhanced market competitiveness. Watch this video to see the new DS1 come to life. 

Key DS1 Accomplishments

  • Productivity is doubled
  • Manufacturing lead-time cut in half
  • FMS and robots operate 24/7
  • Self-contained start-to-finish “Smart Factory”, from raw materials input to shipment out the door
  • Built for environmental efficiency ¬ features such as solar panels and natural lighting reduce costs by 30%, also reducing the environmental burden

The efficiency improvements are a result of investment in a new manufacturing management system and a greater emphasis on automation, robotics and unmanned operations.

More than a century of technology in the making, the DS1 is the factory of the future.

[Read more about the new DS1 in our blog post “New DS1 – What’s In It for You?”]

Sign Up For Updates
Thank you for signing up for Okuma updates. We look forward to sharing our content with you.

We offer a variety of ways for you to stay informed about our events, and to receive general Okuma updates. Fill out the form below to let us know the type of information you'd like to receive.

Find Your Distributor
Sign Up For Updates
Thank you for signing up for Okuma updates. We look forward to sharing our content with you.

We offer a variety of ways for you to stay informed about our events, and to receive general Okuma updates. Fill out the form below to let us know the type of information you'd like to receive.